|
Terminal 5 Construction Project – Heathrow Airport. Terminal 5 is being constructed in two phases: Phase one will open in March 2008 with the completion of the main terminal (T5A) and first satellite building (T5B), phase two will open in 2010 with the construction of the second satellite building (T5C).
|